Washington High School Culinary Arts Renovation

The scope of work included demolition of the existing interior food service facility, installation of a walk-in freezer, cooler box , commercial grade range and vent hood, built-in warming drawer and built-in combination microwave and convection oven. Upgrades to the grease interceptor, plumbing, gas, HVAC and exhaust system were included in the remodel along with the construction of a classroom.