Civil Division![]() Whether your project requires a full service Civil General Contractor, a specialized grading, paving or underground civil subcontractor, or a partner in Design-Build projects, SDB Civil is your solution. We have the expertise, equipment, personnel and the general contracting experience to handle full service site development packages with ease and efficiency. SDB Civil offers turn-key construction services including pre-construction, design assist, project management, project procurement, risk analysis, and construction as your needs require. At SDB Civil, our goal is to simplify the complexities of construction for our clients so that the process is efficient and rewarding. Some of our other strengths are:
Sample Projects: ![]() Sky Harbor 30 MBL Tank Addition This project involved the new construction of an above ground fuel storage tank and all associated piping. SDB was subcontracted by POND Constructors to provide, install and test all fuel, fireline, and storm-drain piping for this new tank addition. SDB also provided all hot-tap and live fuel line tie-in's to make the tank active upon completion. The project was completed in February 2008, and was featured in Airport Improvement Magazine in October of 2009.
Desert Broom Park SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix. Other services performed included value engineering, scheduling, cost estimating, constructability studies and engineering coordination. Supporting elements for the project included: field lighting, a paved entry, eighty-space parking lot with lighting, pedestrian walkways, landscaping, and ramadas with associated lighting. The project also included a rest room with associated water, sewer, electrical, lighting, and water fountain.
Sedona Wastewater Reclamation Plant Upgrades This project consisted of miscellaneous upgrades to the existing wastewater reclamation facility in the City of Sedona. The existing aeration system was upgraded and expanded to handle increased flows, including new aeration system, FRP baffles, new mixers, and new return pumps. The existing solids handling building received a new centrifuge and related piping and controls, along with sludge grinder replacement and a new polymer feed system. SDB installed a new reuse vertical turbine pump and related yard piping to allow for increased options for plant reuse water discharge. The plant SCADA system was also upgraded to handle all new equipment and increased plant processes.
![]() Dual Water Lines This project consisted of complete installation of over 13,000 linear feet of trench combined 4" and 16" PVC waterline along the Central Arizona Project Canal. The water-line was constructed from the existing City of Phoenix Tramanto Pump station, extending along the CAP canal, across Happy Valley Road, and terminating at the Central Arizona Project corporate headquarters. SDB Civil provided complete pipeline excavation, bedding, installation, backfill and testing services resulting in a safe installation within the owner's contract requirements.
![]() |