Facilities

SDB's Sustaining Operations Division has been performing facility work since the company's inception in 1980. We've retained a high profile clientele and continue to work at their large corporate facilities because of our accountability and accessibility to the client.
The need for contracting in an operating facility means the owner desires to expand business functionality with minimum facility downtime. We approach every job with the goal of minimizing business interruption. From multiple shifts, to massive mobilized manpower for 24 hour shutdown, SDB has the experience to perform around the clock and get the client back to work. Our long history of facility work is proof of our success and we would like to share our knowledge and expertise on your next project.

Sustaining Opperations

- Facilities contracting services
- New construction & renovations
- Door/hardware installs & modifications
- Modular furniture installs & modifications
- Facility / department moves & logistics
- Structural steel
- Temporary office & warehouse leasing
- Rigging, crating and shipping
- System scaffolding
Delivery methods:
- Job order contracting
- Construction manager at risk
- Design-build
- Design-bid-build
- Time and material

Sample Projects:
Memorial Union Plaza Renovation
Arizona State University
Demolition and installation of a custom shade structure and renovation of the existing plaza in the heart of the ASU campus.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- January 2009
- $1,500,000
- Studio MA Architects
OWRF Electrical
City of Chandler
SDB changed out the existing electrical gear at the Ocotillo Water Reclamation Facility in Chandler. The facility was fully operational and work had to be performed without any loss of power to the plant. Backup generators were used for the duration of the swap.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- March 2010
- $1,200,000
- Brown & Caldwell
San Carlos High School Remodel
San Carlos Unified School District
Demo, disposed, furnished & installed all new interior finishes including flooring, finished walls, paint, ceilings, and some mechanical - plumbing & electrical installation, new projectors; included cafeteria & gym areas.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- August 2010
- $1,034,000
- SPS + Architects
Diablo Stadium Lighting
City of Tempe
Removal of existing baseball field lighting system, SES, and transformer, and installation of a new light system and primary power connection.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Qualification
- 2 baseball fields
- April 2010
- $832,000
- Olsson Associates
Sunland Elementary Improvements
Roosevelt Unified School District
Remodel 8 restrooms, install 8,000 s.f. concrete walkway, paint total exterior, new parking lot.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- August 2010
- $653,200
- Orcutt-Winslow
Weather Up Water Lines
Arizona State University
Installation of 8 inch infrastructure waterline for new ASU sports complex.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- February 2010
- $651,600
- Stanley Consultants
Kiwanis Park Ramada Renovations
City of Tempe
The Kiwanis Park JOC project included masonry work, installation of seven prefabricated ramada shade structures and upgrading ADA features throughout the 125 acre park. The compressed project time line, budget and value engineering requirements made the Kiwanis Park Ramada Installations project a perfect fit for JOC.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2010
- $568,200
- Olsson Associates
Scottsdale Community College Parking Lot E
Maricopa Community College District
Demolition and mill of existing paving, excavated sub-grade, lime stabilization, grade and compacting, installed new storm drain and new parking lot security lighting.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contracting (JOC)
- August 2009
- $545,200
- Brooks Strand & Associates
Sky Harbor 30 MBL Tank Addition
Arizona Fueling Facilities Corp.
This project involved the new construction of an above ground fuel storage tank and all associated piping. SDB was subcontracted by POND Constructors to provide, install and test all fuel, fireline, and storm-drain piping for this new tank addition. SDB also provided all hot-tap and live fuel line tie-in's to make the tank active upon completion. The project was completed in February 2008, and was featured in Airport Improvement Magazine in October of 2009.
- Delivery Method:
- Completed:
- Budget:
- Engineer:
- Design-Bid-Build
- February 2008
- $500,000
- POND Constructors
Lattie Coor Elementary School Kitchen & Cafeteria Remodel
Avondale Elementary School District
Aside from creating a functional and enjoyable lunchtime experience for the students, the kitchen remodel incorporated high efficiency appliances that helped resolve the food safety and space issues, creating an environment that is efficient, safe and fully functional.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2009
- $307,000
- ADM Group
ERC Friesen Battery Lab
Arizona State University
Conversion of existing work space into new research lab.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- January 2010
- $309,000
- Architectural Nexus
Mercado Nursing Simulation Lab
Arizona State University
Remodel of an existing space into a nursing simulation laboratory.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2010
- $291,000
- Fore Dimensions
Cosmetic Remodeling
The Tech Group
Outdoor improvements, xeriscape, skin, metals, paint; Interior improvements; new bathrooms for employees, paint, flooring, new upscale, fashionable furniture; some electrical & mechanical improvements.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Lump Sum
- 25,000 SF
- September 2010
- $223,000
- N/A
Regency Garage Grease Interceptor Upgrades
City of Phoenix
SDB installed 2 new grease interceptors and other upgrades, approximatley 20,000 SF area.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- June 2010
- $175,000
- CH2M-Hill
Fleet Vehicle Maintenance Facility Remodel
City of Goodyear
This JOC involved concrete demolition, installation of a new shade structure, new vehicle maintenance systems, landscaping and concrete paving.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- June 2008
- $110,000
- City of Goodyear