Parks and Recreation
Park and recreation projects, including both indoor and outdoor, is an area that SDB has a great amount of experienced with. One of the many benefits of working with SDB is that we are a "turn-key" general contractor. Park and Recreation clients can rely on one contractor to manage the construction and do the work. We perform ground work, site improvements and construct above ground structures. No project is too big or small as we have the staff and resources to manage projects of all sizes and schedules.
Parks and Recreation Clients:

City of Phoenix
City of Tempe
City of Chandler
Boys and Girls Clubs of America
Town of Wickenburg
Town of Superior

Sample Projects:
Boys & Girls Club Jerry Colangelo Branch
Boys & Girls Club of Metropolitan Phoenix
In a wonderful opportunity to serve those who provide for our children, SDB was proud to build the 25,000 square-foot ground-up youth recreational facility. The project featured a full size basketball court, gymnasium, an outdoor sports field, basketball court with scoreboards, game room, cafeteria with commercial grade appliances, lockers and administrative offices.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 24,958 SF
- February 2009
- $3,200,000
- Bollinger & Cardenas
Desert Broom Park
City of Phoenix
SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- CMAR
- 4 Acres
- December 2007
- $2,950,000
- Olsson & Associates
Municipal Pool Complex
Town of Wickenburg
This project consisted of the design and construction of 3,000 square feet of buildings consisting of men/women's restrooms, showers/changing areas, enclosed equipment room, offices and storage area. With an eight-lane competition pool with integral zero entry play area with water features and a double loop water slide.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Build
- 3,000 SF
- June 2003
- $1,078,000
- Dieterich Architectural Group, Inc.
Diablo Stadium Lighting
City of Tempe
Removal of existing baseball field lighting system, SES, and transformer, and installation of a new light system and primary power connection.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Qualification
- 2 baseball fields
- April 2010
- $832,000
- Olsson Associates
Celebration Plaza
City of Chandler
Celebration Plaza is a permanent monument near the center of Tumbleweed Park where the Chandler City Council recognizes organizations or individuals for the civic leadership, public outreach, outstanding personal service, and commitment to the community.
- Delivery Method:
- Completed:
- Budget:
- Job Order Contract (JOC)
- May 2007
- $673,000
Municipal Swimming Pool
Town of Superior
Construction of a 4 lane pool with integral zero entry play area, fountain, and restrooms.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Build
- N/A
- July 2002
- $577,000
- Dieterich Architectural Group, Inc.
Kiwanis Park Ramada Renovations
City of Tempe
The Kiwanis Park JOC project included masonry work, installation of seven prefabricated ramada shade structures and upgrading ADA features throughout the 125 acre park. The compressed project time line, budget and value engineering requirements made the Kiwanis Park Ramada Installations project a perfect fit for JOC.
- Delivery Method:
- Completed:
- Budget:
- Architect:
- Job Order Contract (JOC)
- July 2010
- $568,200
- Olsson Associates

