Park and recreation projects, including both indoor and outdoor, is an area that SDB has a great amount of experienced with. One of the many benefits of working with SDB is that we are a "turn-key" general contractor. Park and Recreation clients can rely on one contractor to manage the construction and do the work. We perform ground work, site improvements and construct above ground structures. No project is too big or small as we have the staff and resources to manage projects of all sizes and schedules.

Parks & Rec Clients

  • City of Phoenix
  • City of Tempe
  • City of Chandler
  • Boys and Girls Clubs of America
  • Town of Wickenburg
  • Town of Superior

Usery Park Restroom Improvements

Owner: Maricopa County Parks & Recreation  |  Delivery Method: Job Order Contracting (JOC)  |  Budget: $222,394
SDB performed the remodel/improvements to three restroom facilities at Usery Park. The project included selective demolition, asbestos testing and replacement of damaged concrete slabs. The improvements consisted of metal ceilings inside and metal roof outside, new toilet partitions and accessories, new doors/door hardware, new ceramic tile at interior walls, painting inside and out, some new windows, signs, new plumbing fixtures, new lights inside and outside as well as power upgrades.

Lake Pleasant Restroom Improvements

Owner: Maricopa County Parks & Recreation  |  Delivery Method: Job Order Contracting (JOC)  |  Budget: $195,482
SDB performed the improvements to four restroom facilities at Lake Pleasant. The project included selective demolition and asbestos testing, as well as new toilet partitions and accessories, new doors/hardware, repairs to existing ceramic tile at interior walls, painting inside and out, signs, new plumbing fixtures, new shower benches and new outdoor lights.

Tumbleweed Recreation Center Marquee Display

Owner: City of Chandler  |  Delivery Method: Job Order Contracting (JOC)  |  Budget: $44,939
SDB installed a new outdoor marquee/display at Tumbleweed Recreation Center so the City can project their activities and others. Provided design development assistance services, selective site demolition, underground detection/locator, blue stake, removal of existing plants/tree and irrigation re-direction, foundations, block walls, structural support steel, decorative steel panel, metal roof, electrical and power, access panels, glass (decorative) and installed the new screen, plus programming, testing and City training.

Estrella Mountain Regional Park Restroom Improvements

Owner: Maricopa County Parks & Recreation  |  Delivery Method: Job Order Contracting (JOC)  |  Budget: $63,771
SDB performed the improvements to restroom facilities #3 and #7 at Estrella Mountain Regional Park. The project included demolition and asbestos testing. The improvements consisted of new toilet partitions and accessories, new frames and doors, painting and replacement of the existing septic system with a new 2,500 gallon tank.

McDowell Mountain Regional Park Restrooms Remodel

Owner: Maricopa County Parks & Recreation  |  Delivery Method: Job Order Contracting (JOC)  |  Budget: $112,899
The project consisted of the remodel of two restroom facilities at the McDowell Mountain Regional Park. SDB provided asbestos testing and replaced the existing roof with a standing seam metal roof with extended warranty, new metal fascia/eaves and installed metal inside the restroom ceilings. We also replaced existing doors and installed new low maintenance plumbing fixtures, power, LED lighting, hand dryers, new paint and signs. SDB’s on-site Superintendent maintained quality assurance and quality control daily and worked closely with owner inspections to achieve a zero punchlist.