Industrial & Commercial

Industrial projects by SDB inc

SDB's Industrial and Commercial projects can be found across the State of Arizona. From small tenant improvement projects to large commercial centers, SDB offers a variety of construction services to meet the needs of small "mom and pop" business owners as well as large retail anchor stores and industrial manufacturing facilities.

Share |
Head of screw

Industrial & Commercial Clients:

Head of screw
  • Woodlands Village

  • Higley Unified School District #60

  • United States Postal Service

  • Central Arizona Project

  • Griffiths Holding Corporation

  • Arizona Fueling Facilities Corp.

  • Phoenix Towers

  • The Tech Group

  • Sommelier de Sedona

  • Joy Cone Company

  • Foxboro Ranch Estates

  • Sedona Creative Life Center

Head of screwHead of screw
  • Microsemi Logo
  • Scottsdale Community College Logo
  • Higley Unified School District
  • United States Postal Service
  • Griffiths Holding Corporation
  • Central Arizona Project
  • Phoenix Sky Harbor
  • The Tech Group
  • Joy Cone
  • Foxboro Ranch Estates

Sample Projects:

higley unified school district logo
higley school district warehouse

School District Warehouse

Higley Unified School District #60

17,300 SF of warehouse space with minimal office Design-Build project. Starting with site development and preconstruction, the Design Team used a concrete-tilt construction method to build the warehouse shell. The warehouse area has a 22' clear height a custom rack system created by the DB Team.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Build
  • 17,296 SF
  • July 2008
  • $2,195,000
  • Dieterich Architectural Group, Inc.
United States Postal Service Logo
USPS Gilbert AZ Fiesta Annex
Read More

Gilbert AZ Fiesta Annex

United States Postal Service

Construction of 10,915 SF mail distribution center. Work included a CMU construction type building, with loading docks, truck well and site development.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 10,915 SF
  • January 2010
  • $1,632,000
  • APMI, Inc
Central Arizona Project Logo
Central Arizona Project Canal

Dual Water Lines

Central Arizona Project

This project consisted of complete installation of over 13,000 linear feet of 4 inch and 12,000 linear feet of 16 inch PVC waterline along the Central Arizona Project Canal. The water-line was constructed from the existing City of Phoenix Tramanto Pump station, extending along the CAP canal, across Happy Valley Road, and terminating at the Central Arizona Project corporate headquarters. SDB Civil provided complete pipeline excavation, bedding, installation, backfill and testing services.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Engineer:
  • Qualification
  • 10 acres
  • January 2007
  • $1,364,000
  • CSA Engineering
Griffiths Logo
Griffiths Bay Building
Read More

Griffiths Bay Building

Griffiths Holding Corporation

Construction of a new ground up facility to house multiple tenants in an open bay occupancy.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated
  • 15,040 SF
  • July 2009
  • $809,600
  • Dieterich Architectural Group, Inc
Sky Harbor Logo
sky harbor 30 mlb tank
Read More

Sky Harbor 30 MBL Tank Addition

Arizona Fueling Facilities Corp.

This project involved the new construction of an above ground fuel storage tank and all associated piping. SDB was subcontracted by POND Constructors to provide, install and test all fuel, fireline, and storm-drain piping for this new tank addition. SDB also provided all hot-tap and live fuel line tie-in's to make the tank active upon completion. The project was completed in February 2008, and was featured in Airport Improvement Magazine in October of 2009.

  • Delivery Method:
  • Completed:
  • Budget:
  • Engineer:
  • Design-Bid-Build
  • February 2008
  • $500,000
  • POND Constructors
Phoenix Towers

Phoenix Towers Renovations

Phoenix Towers

Pool cabana renovations, finishes, paint, millwork mechanical, electrical, flooring, new shade structures, xeriscape & landscaping an area aprox. 0.5 acres.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Lump Sum
  • 1/2 Acre
  • August 2010
  • $386,130
  • Westlake Reed Leskosky
The Tech Group Logo
The Tech Group Scottsdale cosmetic remodeling

Cosmetic Remodeling

The Tech Group

Outdoor improvements, xeriscape, skin, metals, paint; Interior improvements; new bathrooms for employees, paint, flooring, new upscale, fashionable furniture; some electrical & mechanical improvements.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Lump Sum
  • 25,000 SF
  • September 2010
  • $223,000
  • N/A