Education Projects

Educational construction projects
Head of screw

Educational Clients:

Head of screw
  • Arizona State University

  • Avondale Elementary School District

  • Cartwright School District

  • Chandler-Gilbert Community College

  • Gilbert Schools

  • Glendale Union High School District

  • Higley Unified School District

  • Mesa Public Schools

  • Maricopa Community College District

  • Roosevelt School District

  • San Carlos School District

  • Scottsdale Community College

  • Scottsdale Public Schools

  • Washington Elementary School District

  • University of Arizona

Head of screwHead of screw
SDB Inc has been working with school Districts since 1992.

SDB has enjoyed working on contracts for numerous School Districts throughout the state of Arizona. Our range of work has included Construction Management at Risk, Design-Build, Job order Contracting, High-Tech systems, Site Improvements and Civil services. Throughout our experience with School Districts, we've faced many different types of challenges and have proved to be resilient. SDB understands what it takes to successfully complete District projects with challenges such as off-hour time constraints, alternative working conditions, and security/safety issues while maintaining a safe work environment at the school facility. We have performed work during summer breaks, during regular school hours and on many occasions we have worked weekends. With all of those considerations, we are able to perform quality work on time at a fair price. Have confidence knowing you're working with experienced School District project professionals.

Share |
  • Glendale Union High School District Logo
  • Arizona State Univeristy Logo
  • Cartwright School District Logo
  • Chandler-Gilbert Community College logo
  • Gilbert Schools logo
  • Higley Unified School District Logo
  • Maricopa Community Colleges Logo
  • San Carlos School District Logo
  • Scottsdale Public Schools logo
  • Washington Elementary School District Logo
  • Mesa Public Schools Logo
  • Scottsdale Community College Logo
  • Avondale ESD Logo
  • Roosevelt USD Logo
  • Scottsdale USD Logo

Sample Projects:

Apache Junction Unified School District
Apache Juntion Culinary Kitchen
Read More

Apache Junction High School Culinary Kitchen

Apache Junction High School

Reconfiguration classroom space into a full scale culinary kitchen. Work included electrical, HVAC, roof drainage, coordination and installation of commercial grade appliances and appropriate ventilation systems, new fire sprinkler system, floor resurfacing, new paint, ADA upgrades, new grease trap installation, and various civil site work.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • October 2011
  • $850,000
  • BWLP Architecture
ASU Logo
Nursing and Health Innovation Instruction Kitchen
Read More

Nursing and Health Innovation Instruction Kitchen

Arizona State University

Remodel of exisiting office space into a cooking classroom with a mock restaurant.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • February 2011
  • $1,234,000
  • LEA Architects
The Tech Group Logo
Sunland Elementary Improvements

Sunland Elementary Improvements

Roosevelt Unified School District

Remodel 8 restrooms, install 8,000 s.f. concrete walkway, paint total exterior, new parking lot.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • August 2010
  • $653,200
  • Orcutt-Winslow
ASU Logo
ASU Mercado Nursing Simulation Lab

Mercado Nursing Simulation Lab

Arizona State University

Remodel of an existing space into a nursing simulation laboratory.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • July 2010
  • $291,000
  • Fore Dimensions
Maricopa Community Colleges logo
Jacaranda Hall
Read More

Jacaranda Hall

Chandler-Gilbert Community College

SDB served as the General Contractor for this 5,991 SF ground-up mixed use classroom and office building at the CGCC Pecos Campus.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 5,991 SF
  • August 2008
  • $935,000
  • Gabor Lorant Architects
ASU Logo
ASU Memorial Union Plaza
Read More

Memorial Union Plaza Renovation

Arizona State University

Demolition and installation of a custom shade structure and renovation of the existing plaza in the heart of the ASU campus.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • January 2009
  • $1,500,000
  • Studio MA Architects
higley unified school district logo
higley school district warehouse

School District Warehouse

Higley Unified School District #60

17,300 SF of warehouse space with minimal office Design-Build project. Starting with site development and preconstruction, the Design Team used a concrete-tilt construction method to build the warehouse shell. The warehouse area has a 22' clear height a custom rack system created by the DB Team.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Build
  • 17,296 SF
  • July 2008
  • $2,195,000
  • Dieterich Architectural Group, Inc.
Avondale ESD Logo

Lattie Coor Elementary School Kitchen & Cafeteria Remodel

Avondale Elementary School District

Aside from creating a functional and enjoyable lunchtime experience for the students, the kitchen remodel incorporated high efficiency appliances that helped resolve the food safety and space issues, creating an environment that is efficient, safe and fully functional.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • July 2009
  • $307,000
  • ADM Group
Maricopa Community College Distric logo
Scottsdale Community College BU IT Building
Read More

Scottsdale Community College IT Building Renovations

Maricopa Community College District

Complete gut out and reconfiguration of an existing building to a High Tech I.T. training facility

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • 1,262 SF
  • January 2010
  • $1,569,000
  • Architectural Resource Team, Inc.
Gilbert Public Schools Logo
Mesquite Elementary School Renovation

Mesquite Elementary School Renovation

Gilbert Public Schools

SDB was contracted for this two phase classroom expansion and renovation. Phase I involved adding 6,000 SF of classroom space to an existing building. Phase II consisted of adding 31,000 SF of new classrooms increasing the total size of classroom space by 250%. Site modification involved grading, surfacing and engineering the existing parking lot for the new building footprint. SDB also constructed the playground recreation area adjacent to the new site. Upgrades to data and communication lines were also performed.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • April 2007
  • $5,284,805
  • HDA Architects, LLC.
Gilbert Public Schools Logo
Lattie Coor Kitchen and Cafeteria Remodel

Patterson Elementary School Upgrades & New Building

Gilbert Public Schools

SDB was contracted to renovate and perform upgrades to the existing campus. The project consisted of adding a new 2,500 SF classroom building and the extension of restroom facilities. The overall mechanical upgrades to the campus were approximately 50,000 SF in size and performed during off hours and weekends.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Design-Bid-Build
  • November 2006
  • $3,238,000
  • HDA Architects, LLC.
ASU Logo

ERC Friesen Battery Lab

Arizona State University

Conversion of existing work space into new research lab.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • January 2010
  • $309,000
  • Architectural Nexus
ASU Logo
ASU Physics Chair Lab

Physics Chair Lab

Arizona State University

This CMAR renovation project involved remodeling a 5,000 SF technology lab. Construction included a 17 station Nano process high vacuum line, gas cabinets with custom gas monitoring and alarm system, HVAC installations, electrical bus and exhaust and fire sprinkler installation.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • CMAR
  • 5000 SF
  • May 2008
  • $1,427,000
  • DFDG
San Carlos school logo
San Carlos High School
Read More

San Carlos High School Remodel

San Carlos Unified School District

Demo, disposed, furnished & installed all new interior finishes including flooring, finished walls, paint, ceilings, and some mechanical - plumbing & electrical installation, new projectors; included cafeteria & gym areas.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • August 2010
  • $1,034,000
  • SPS + Architects
ASU Logo
ASU - Weather Up Water Lines

Weather Up Water Lines

Arizona State University

Installation of 8 inch infrastructure waterline for new ASU sports complex.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • February 2010
  • $651,600
  • Stanley Consultants
Maricopa Community College Distric logo
Scottsdale Community College Parking Lot E

Scottsdale Community College Parking Lot E

Maricopa Community College District

Demolition and mill of existing paving, excavated sub-grade, lime stabilization, grade and compacting, installed new storm drain and new parking lot security lighting.

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contracting (JOC)
  • August 2009
  • $545,200
  • Brooks Strand & Associates
Glendale Union High School District Logo
Washington H.S. Culinary Arts Renovation

Washington High School Culinary Arts Renovation

Glendale Union High School District

The scope of work included demolition of the existing interior food service facility. The installation of walk-in freezer, cooler box , commercial grade range and vent hood; built-in warming drawer, built-in combination microwave and convection oven. Upgrades to the grease interceptor, plumbing, gas, HVAC, exhaust system were included in the remodel along with the construction of a classroom.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Lump Sum
  • 4,000 SF
  • August 2008
  • $520,000
  • Gilliland / Brubaker Architects
Glendale Union High School District Logo
Thunderbird H.S. Culinary Arts Renovation

Thunderbird High School Culinary Arts Renovation

Glendale Union High School District

This renovation project was designed with an updated look and new energy efficient equipment. The project scope included a complete demolition of the existing kitchen, replacing the outdated kitchen with state-of-the-art commercial cooking equipment and modern restaurant style stoves, ovens and dishwashers.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Lump Sum
  • 4,000 SF
  • August 2008
  • $495,000
  • Gilliland / Brubaker Architects
Scottsdale Unified School District
Apache Elementary School Bus Parking Lot

Apache Elementary School Bus Parking Lot

Scottsdale Unified School District

The district needed a bus lot with an increased capacity yard to serve the new bus fleet additions. The project was multi-phased so that daily bus operations could be maintained while the project was under construction. The project scope included a complete demolition of the existing parking lot and construction of a new bus yard.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated
  • 50,000 SF
  • November 2005
  • $245,000
  • Hess Roundtree, Inc.
ASU Logo
ASU SRC Ball Field

Student Recreation Ball Field

Arizona State University

Remove existing softball fields, and install new irrigation and sod

  • Delivery Method:
  • Completed:
  • Budget:
  • Architect:
  • Job Order Contract (JOC)
  • December 2009
  • $77,000
  • Aqua Engineering
University of Arizona Logo
University of Arizona Medical Office

Medical Center Office Remodel

University of Arizona

Remodel existing office to new configuration.

  • Delivery Method:
  • Completed:
  • Budget:
  • Job Order Contract (JOC)
  • August, 2007
  • $46,600
Glendale Union High School District Logo
Moon Valley H.S. Culinary Arts Renovation

Moon Valley High School Culinary Arts Renovation

Glendale Union High School District

Remodel of culinary arts room included installation of new chilled water system, new kitchen equipment, video monitoring and recording equipment, demonstration kitchen, new coolers, food preparation areas, dry storage and new cabinetry.

  • Delivery Method:
  • Size:
  • Completed:
  • Budget:
  • Architect:
  • Negotiated
  • 25,700 SF
  • August 2009
  • $830,000
  • Gilliland / Brubaker Architects