Design-Bid-Build
Design-Bid-Build Projects
SDB offers turn-key solutions for your construction project. From site development services to tenant improvements, we are able to work from the ground up to finished vertical construction. We are a full service construction management and program management firm with a history of stable leadership and financial strength. Our goal is to simplify the complexities of construction for our clients so that the process is efficient and rewarding.
Sample Projects:
Main St. BRT Bus Station
City of Mesa
SDB was selected by Valley Metro to install 26 stations, transit signal priority, queue jump lanes, and dynamic message display signs along the new Bus Rapid Transit route in Mesa, Arizona. The BRT functions as a 12.5 mile long extension to the light rail system.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 26 bus stops
- November 2009
- $5,800,000
- TranSystems
Dining Room Expansion
Arizona Veterans Services - Phoenix, AZ
Dining room expansion for Arizona State Veterans. Constructed a new two story addition adjacent to the existing dining rooms (approximately 1,900 SF per floor) for a total of 3,800 SF in the existing courtyard. This project consisted of modifications to mechanical, plumbing and electrical systems to expand existing systems for the new area. Modifications to the existing fire sprinkler and fire alarm systems were required.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 3,778 SF
- November 2009
- $4,000,000
- Fore Dimensions
Boys & Girls Club Jerry Colangelo Branch
Boys & Girls Club of Metropolitan Phoenix
In a wonderful opportunity to serve those who provide for our children, SDB was proud to build the 25,000 square-foot ground-up youth recreational facility. The project featured a full size basketball court, gymnasium, an outdoor sports field, basketball court with scoreboards, game room, cafeteria with commercial grade appliances, lockers and administrative offices.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 24,958 SF
- February 2009
- $3,200,000
- Bollinger & Cardenas
Stapley Healthcare Tenant Improvement
Cigna Healthcare
SDB was contracted to build out a 20,000 SF tenant improvement for CIGNA Healthcare at the Stapley Corporate Center. The space was delivered in shell condition. Improvements added were offices, examination rooms, a waiting room and a pharmacy lab.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 20,000 SF
- September 2007
- $2,195,000
- Westlake Reed Leskosky
Municipal Building Remodel
City of Mesa
Remodel of approximately 38,000 SF on three floors done in three phases. Included new mechanical equipment, electrical systems, and new interior and exterior finishes.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Low Bid
- 38,000 SF
- December 2006
- $2,065,700
- Saemisch Di Bella Architects, Inc
Gilbert AZ Fiesta Annex
United States Postal Service
Construction of 10,915 SF mail distribution center. Work included a CMU construction type building, with loading docks, truck well and site development.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 10,915 SF
- January 2010
- $1,632,000
- APMI, Inc
Corazon Treatment Facility
Chicanos Por La Causa, Inc.
Existing dwelling units were demolished and removed to make room for this ground-up expansion project. The 17,000 SF building houses patients on the second floor with administrative offices, common areas and a kitchen on the first floor.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 11,832 SF
- February 2009
- $1,600,000
- David Ortega Architect & Associates, Inc.
Scottsdale Community College IT Building Renovations
Maricopa Community College District
Complete gut out and reconfiguration of an existing building to a High Tech I.T. training facility
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 1,262 SF
- January 2010
- $1,569,000
- Architectural Resource Team, Inc.
Jacaranda Hall
Chandler-Gilbert Community College
SDB served as the General Contractor for this 5,991 SF ground-up mixed use classroom and office building at the CGCC Pecos Campus.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 5,991 SF
- August 2008
- $935,000
- Gabor Lorant Architects
Griffiths Bay Building
Griffiths Holding Corporation
Construction of a new ground up facility to house multiple tenants in an open bay occupancy.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 15,040 SF
- July 2009
- $809,600
- Dieterich Architectural Group, Inc
San Tan Healthcare Tenant Improvement
Cigna Healthcare
SDB was contracted to build out a 3,525 SF tenant improvement for CIGNA Healthcare at the Copper Point Center. The space was delivered in gray shell condition. Improvements added were 3 offices, 4 examination rooms, waiting room, phlebotomy lab, clean room, reception desk, medical records storage room, nurse station and a pharmacy.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 3525 SF
- February 2009
- $381,000
- TriArch Architecture & Design

