Building Division
SDB's Building Division offers turn-key solutions for construction projects including new building construction, site development services, tenant improvements, construction management and pre-construction services.
SDB has the capabilities to self perform a variety of services including framing, drywall, finishes, ceilings, flooring, metal fabrications, carpentry, demolition, concrete, and installation of doors and windows. We also have our own Civil Division that performs site and civil work. Our self-performance capabilities give our clients the added benefit of knowing that we have a work force available that can perform general carpentry work at a moment's notice. This is especially important for jobs that have fast tracked project schedules. We are able to mobilize our own field carpenters quickly and have work performed 24 hours a day as well as night and weekend schedules.

Building Division

- Pre-construction services
- General contracting
- Construction management
- Building Information Modeling (BIM)
- Tenant improvements
- Civil general contracting
Delivery Methods:
- Job order contracting
- Design-build
- Construction manager at risk
- Negotiated
- Cost plus
- Design-bid-build

Sample Projects:
Tucson Veteran's Home
Arizona Veterans Services - Tucson, AZ
The project is the second of its kind in the State of Arizona. The ±130,000 square foot LEED facility houses 120 occupants with accommodations such as single dwelling units, activity rooms, common dining areas, rehabilitation facility and outdoor courtyard space.
- Delivery Method:
- Size:
- Completed:
- Cost:
- Architect:
- Design-Build
- 130,000 SF
- November 2011
- $26,400,000
- Orcutt/Winslow
Clean Room Construction and Renovation
Microsemi
Constructed a 5,500 SF class 10/100 clean room lab, central plant upgrades and process system upgrades.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 5500 SF
- December 2007
- $7,400,000
- SDB, Inc.
Main St. BRT Bus Station
City of Mesa
SDB was selected by Valley Metro to install 26 stations, transit signal priority, queue jump lanes, and dynamic message display signs along the new Bus Rapid Transit route in Mesa, Arizona. The BRT functions as a 12.5 mile long extension to the light rail system.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 26 bus stops
- November 2009
- $5,800,000
- TranSystems
Dining Room Expansion
Arizona Veterans Services - Phoenix, AZ
Dining room expansion for Arizona State Veterans. Constructed a new two story addition adjacent to the existing dining rooms (approximately 1,900 SF per floor) for a total of 3,800 SF in the existing courtyard. This project consisted of modifications to mechanical, plumbing and electrical systems to expand existing systems for the new area. Modifications to the existing fire sprinkler and fire alarm systems were required.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 3,778 SF
- November 2009
- $4,000,000
- Fore Dimensions
School District Warehouse
Higley Unified School District #60
17,300 SF of warehouse space with minimal office Design-Build project. Starting with site development and preconstruction, the Design Team used a concrete-tilt construction method to build the warehouse shell. The warehouse area has a 22' clear height a custom rack system created by the DB Team.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Build
- 17,296 SF
- July 2008
- $2,195,000
- Dieterich Architectural Group, Inc.
Gilbert AZ Fiesta Annex
United States Postal Service
Construction of 10,915 SF mail distribution center. Work included a CMU construction type building, with loading docks, truck well and site development.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 10,915 SF
- January 2010
- $1,632,000
- APMI, Inc
Corazon Treatment Facility
Chicanos Por La Causa, Inc.
Existing dwelling units were demolished and removed to make room for this ground-up expansion project. The 17,000 SF building houses patients on the second floor with administrative offices, common areas and a kitchen on the first floor.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 11,832 SF
- February 2009
- $1,600,000
- David Ortega Architect & Associates, Inc.
Scottsdale Community College IT Building Renovations
Maricopa Community College District
Complete gut out and reconfiguration of an existing building to a High Tech I.T. training facility
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 1,262 SF
- January 2010
- $1,569,000
- Architectural Resource Team, Inc.
Jacaranda Hall
Chandler-Gilbert Community College
SDB served as the General Contractor for this 5,991 SF ground-up mixed use classroom and office building at the CGCC Pecos Campus.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 5,991 SF
- August 2008
- $935,000
- Gabor Lorant Architects
Griffiths Bay Building
Griffiths Holding Corporation
Construction of a new ground up facility to house multiple tenants in an open bay occupancy.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Negotiated
- 15,040 SF
- July 2009
- $809,600
- Dieterich Architectural Group, Inc
Municipal Swimming Pool
Town of Superior
Construction of a 4 lane pool with integral zero entry play area, fountain, and restrooms.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Build
- N/A
- July 2002
- $577,000
- Dieterich Architectural Group, Inc.
San Tan Healthcare Tenant Improvement
Cigna Healthcare
SDB was contracted to build out a 3,525 SF tenant improvement for CIGNA Healthcare at the Copper Point Center. The space was delivered in gray shell condition. Improvements added were 3 offices, 4 examination rooms, waiting room, phlebotomy lab, clean room, reception desk, medical records storage room, nurse station and a pharmacy.
- Delivery Method:
- Size:
- Completed:
- Budget:
- Architect:
- Design-Bid-Build
- 3525 SF
- February 2009
- $381,000
- TriArch Architecture & Design