City Projects

Kiwanis Park Ramada Renovation
Tempe, AZ

Provide and install 7 new park ramadas with new landscape, irrigation, and lighting

  • Delivery type:
  • Completed:
  • Cost:
  • Architect:
  • JOC
  • July 2010
  • $568,236
  • Olsson Associates

Regency Garage-Interceptor Upgrades
City of Phoenix

SDB installed 2 new grease interceptors and other upgrades, approximatley 20,000 SF area.

  • Delivery type:
  • Size:
  • Completed:
  • Cost:
  • JOC
  • 20,000 SF
  • June 2010
  • $175,000
12
11

Diablo Stadium Lighting
31 E. 5th Street, Tempe AZ 85281

This project involved the remove of an existing baseball field lighting system, SES, and transformer, and the installation of a new light system and primary power connection.

  • Delivery type:
  • Completed:
  • Cost:
  • Qualification
  • April 2010
  • $832,000

Main St. BRT Bus Station
Mesa, AZ

SDB was selected by Valley Metro to install 26 stations, transit signal priority, queue jump lanes, and dynamic message display signs along the new Bus Rapid Transit route in Mesa, Arizona. The BRT functions as a 12.5 mile long extension to the light rail system.

  • Delivery type:
  • Completed:
  • Cost:
  • Architect:
  • Bid
  • Nov. 2009
  • $5.8 M
  • TranSystems
11

Fleet Vehicle Maintenance Facility remodel
City of Goodyear

This JOC involved concrete demolition, installation of a new shade structure, new vehicle maintenance systems, landscaping and concrete paving.

  • Delivery type:
  • Completed:
  • Cost:
  • JOC
  • June 2008
  • $110,000
12

Desert Broom Park
Cave Creek Rd & Tatum Blvd. – Phoenix, AZ

SDB was contracted to perform preconstruction, design and general contracting services for this 4 acre park as part of the CMAR team selected by the City of Phoenix. Other services performed included value engineering, scheduling, cost estimating, constructability studies and engineering coordination. Supporting elements for the project included: field lighting, a paved entry, eighty-space parking lot with lighting, pedestrian walkways, landscaping, and ramadas with associated lighting. The project also included a rest room with associated water, sewer, electrical, lighting, and water fountain.

  • Delivery type:
  • Size:
  • Completed:
  • Cost:
  • CMAR
  • 4 acres
  • Dec. 2007
  • $2,950,000
12